Installation Guide
Setting up your Orochi Cobra Bag is quick and simple. Follow these steps to get your training station ready in no time.
What’s Included in the Box
-
2 × Sandbags for the base
-
1 × Bottom metal pole
-
1 × Orochi punching ball
-
1 × Locking screw
Tools You'll Need
-
~80 kg of sand (recommended for max stability)
-
A pump for the punching ball
-
A stable, flat surface
Step-by-Step Installation
-
Prepare the Base
Fill both sandbags with ~40 kg each (80 kg total). Place them on a flat surface and lock them together. Place the first bag on the base. Position the second bag on top and clip it firmly to lock the bags. -
Attach the Upright Post
Insert the bottom pole into the base. Then connect the top pole on top of it. -
Mount the Punching Ball
Slide the Orochi ball (half-inflated) over the top cup. Tighten the laces firmly around the cup to lock it in place. -
Inflate the Ball
Use the pump to inflate the ball. Do not overinflate, it should feel firm but flexible. -
Adjust the Height & Lock
Set the ball so it sits just below your chin level. Insert the locking screw and tighten securely. -
Final check
Move the bag slightly to ensure everything is stable and secure. Add extra sand if needed.
Done. You’re Ready. Your Orochi Cobra Bag is now set for battle.